The project will see the demolition of two buildings which occupy 31-49 Brick Street and the erection of a stepped five-storey to eight-storey building with an additional basement level which will operate as an extension to the Grade II listed Sheraton Grand Park Lane.
The building is split into three stepping blocks. These are emphasised with differently coloured brickwork and further articulated with varied window treatments to create a rich and vibrant façade to the new streetscape with high-quality materials and detailing. Our design creates a contextual response to the site constraints and will dramatically improve the public realm on this narrow Mayfair street with a recessed ground floor and an active frontage.